Posted date
Production activity went from January to September 2011. The product acquired mostly Sengon, Mahogany and Teak. The harvesting process was supervised by Trees4Trees or/with local coordinator. Considering the extensive location, more time was required. This time described the continuous process after the timber cut and observation by Trees4Trees.
Team of Trees4Trees was observing production process. Two of them registered the loading of wood onto the truck. After cutting, the timber the arranged on the left and right side of the road, waiting for transportation. This activity was called skidding. The objective of skidding was to ease the registration and transportation process. Mr. Ejeb (left) of Trees4Trees was coordinating with Mr. Ali Rusman (marketing staff of Rukun Tani farmer group; middle) before starting the production process, accompanied by Mr. Darisman (right) at Jrahi village, Gunungwungkal, Management Unit Pati.
Add comment